For the complete documentation index, see llms.txt. Markdown versions of documentation pages are available by appending .md to page URLs.
Skip to content

Set up multiple Milestone servers at remote sites

Plan a multi-site Milestone deployment that sends camera events to a central Command Centre.

Scenario: 100 or more sub-sites, each with its own Milestone server, all feeding one central Command Centre that collects camera event data.

  • Performance depends on total camera count, deployment architecture (federated versus singular), and server resources. Each camera behaves like an "input"; load is driven by event volume per camera and the number of FMF/FTCAPI connections. Gallagher suggests not receiving motion-detection events, and instead creating specific alarm events from the cameras, to cut event volume.

  • Middleware recommendation: prefer multiple Milestone systems connected to Gallagher over one large consolidated system. This distributes load (multiple FMF/FTCAPI connections versus one) and improves fault tolerance. There is no known limit on the number of Milestone systems.

Last updated

Was this helpful?